Asset Valuation - Replacement Unit Rates 2025/26

Financial Year: 2025/26
Version: 1.10
Released: May 2026
Comments: There is a slight decrease in the rate compared to the prior 24/25 rate.

Structure TypeUnit Cost m/m2
Bridge: Vehicular (single span)
£10,242.15
Bridge: Vehicular (2 or 3 spans)    
£7,345.56
Bridge: Vehicular (4 or more spans)
£5,241.30
Bridge: Pedestrian/Cycle (single span)
£6,238.56 
Bridge: Pedestrian/Cycle (multi-span)
£3,743.78
Cantilever Road Sign
£142,131.47
Chamber/Cellar/Vault
£7,106.73
Culvert (single cell)
£7,324.58
Culvert (multi-cell)
£3,663.10
High Mast Lighting
£42,638.80
Retaining Wall (height > 3m)
£3,477.52
Retaining Wall (height ≤ 3m)
£2,607.74
Sign/Signal Gantry [cantilever]
£14,211.86
Sign/Signal Gantry [spanning]
£14,211.86
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height > 3m)
£1,273.21
Structural Earthworks - Reinforced/Strengthened Soil/Fill Structure (height ≤ 3m)
£1,702.45
Underpass: Vehicular
£12,791.80
Underpass (or Subway): Pedestrian
£6,898.57
Subway: Pipe
£7,106.73
Tunnel (bored)
£31,980.31
Tunnel (cut and cover)
£21,320.20